23-Feb-2011





The new window was set.



Toilet in the master bedroom.



Wall partition is almost completed.
*
*
***********************************************************************************************

25-Feb-2011

Tiles in the kitchen was put on.



Ceiling light-rail was being prepared.
*
*
**********************************************************************************************
25-Feb-2011

Flooring preparation...



*
*
*******************************************************************************************

27-Feb-2011

New air conditioner had been installed.



*
*
***********************************************************************************************
2-Mar-2011


Wooden flooring had been completed and covered.


Old door had been dismantled and new door's frame was set in place.



Start making kitchen's cabinet on the spot.
*
*
*********************************************************************************************

4-Mar-2011


All the "si-fu" who were busy working to get the jobs done...



Fordable door was installed.





Wall was polished too...


Master bedroom.



Kid's bedroom.



toilet #1



toilet #2



Kitchen cabinet...



Although we paid them, I thank you for their hard work and dedication to build the house for us. They are the one who make things so far so good.....
*
*
*
*
*

Thursday, March 3, 2011

Construction Stopped (before CNY)

The day before we fly back to Malaysia for CNY holiday, we went to check the house again...




The construction work had been stopped by then, would resume work after the 8th day of CNY.



The windows for the whole house were ready, just waited for the scaffolding to be set up to get them fixed.



The tiles were all ready too.





The main switched box was done.


To me, I saw debris everywhere. To sons, they saw things to play with everywhere.










I would like to bring the boys to the construction site more often, so that they will remember the house as a whole, right from the beginning to its completion.