23-Feb-2011





The new window was set.



Toilet in the master bedroom.



Wall partition is almost completed.
*
*
***********************************************************************************************

25-Feb-2011

Tiles in the kitchen was put on.



Ceiling light-rail was being prepared.
*
*
**********************************************************************************************
25-Feb-2011

Flooring preparation...



*
*
*******************************************************************************************

27-Feb-2011

New air conditioner had been installed.



*
*
***********************************************************************************************
2-Mar-2011


Wooden flooring had been completed and covered.


Old door had been dismantled and new door's frame was set in place.



Start making kitchen's cabinet on the spot.
*
*
*********************************************************************************************

4-Mar-2011


All the "si-fu" who were busy working to get the jobs done...



Fordable door was installed.





Wall was polished too...


Master bedroom.



Kid's bedroom.



toilet #1



toilet #2



Kitchen cabinet...



Although we paid them, I thank you for their hard work and dedication to build the house for us. They are the one who make things so far so good.....
*
*
*
*
*