The new window was set.
Toilet in the master bedroom.*
***********************************************************************************************
25-Feb-2011
Tiles in the kitchen was put on.
Flooring preparation...
New air conditioner had been installed.

25-Feb-2011
Tiles in the kitchen was put on.*
*
**********************************************************************************************
25-Feb-2011
Flooring preparation...*
*******************************************************************************************
*******************************************************************************************
27-Feb-2011
New air conditioner had been installed.*
*
***********************************************************************************************
2-Mar-2011

Wooden flooring had been completed and covered.